ComfortIQ
MANUAL J + S + D INTAKELive contractor workflow · sketch through duct design
INTAKE VALIDATION CHECKER v4214%Intake completeLive demo answers stay on this device.
STEP 1 OF 7

Start with the job

This identifies the weather location and the Manual J scope.

DESIGN TEMPERATURESEnter the property address to generate design temperatures.The contractor does not need to enter these manually.
Purchased calculation Choose the Manual or package already purchased for this job. Only the questions needed for that purchase will open.
What will you provide? Select every type of information you plan to enter or upload for this job.
STEP 2 OF 7

Set the whole-home defaults

Enter construction details once. Rooms inherit these values unless you override them.

OPTIONAL ADDRESS ASSIST

Look up the construction era, or enter everything manually

ComfortIQ can use the property address and year built to suggest likely whole-home construction details. Nothing is changed until you approve it.

Blower door test
A test that measures how much air leaks through the home at a set pressure.Optional test information
NFRC rated?
Choose Yes when the window has an official NFRC label showing its U-Factor and SHGC.
Not sure? Search the manufacturer and model or part number.
Opens a new tab. Verify U-factor and SHGC against the official product rating.

Fireplace?
Choose Yes if the home has a wood, gas, or open fireplace. Fireplaces can affect air leakage and heating load.
Ducts in an unconditioned area?
Choose Yes when any duct runs through an attic, garage, crawlspace, or other area outside the heated and cooled home.Attic, garage, crawlspace, or another space outside the conditioned home.
Are there skylights?
Choose Yes for windows installed in the roof or ceiling. Skylights add solar heat and must be included in the load.
STEP 3 OF 7

Describe each level

Add the outside dimensions and typical ceiling height for each floor of the home.

GOOGLE EARTH MEASUREMENT

Trace the home, then enter the footprint below

The property address from Step 1 will open automatically in Google Earth.

Trace home in Google EarthOpen the saved address and measure its exterior footprint
LEVEL 1
STEP 4 OF 7

Walk room by room

Add exterior walls, windows, and doors only. Interior walls do not affect the load.

1room added
YOUR MANUAL J INTAKE ENDS HERE

Rooms complete? Submit Manual J now.

You do not need to complete Manual S or Manual D unless they are included in your purchase.

STEP 5 OF 7 · MANUAL S

Match equipment to the calculated load

Contractors provide preferences or known equipment. ComfortIQ Design verifies certified performance against the final Manual J results.

Manual J → Manual SWhole-home and zone loads transfer here automatically. Equipment is not approved from nominal tonnage alone.
AHRI Site ↗The certificate number proving the outdoor unit, indoor coil, and furnace or air handler are a tested equipment match.
MANUAL J LOADCalculated after reviewHeating, total cooling and sensible cooling
MANUAL S CHECKPending equipment dataComfortIQ Design checks design-condition capacity and oversizing limits
AHRI MATCHCertificate requiredOutdoor, indoor and furnace combination when applicable
STEP 6 OF 7 · MANUAL D

Describe the actual duct route

Room airflow comes from Manual J. The contractor supplies the equipment location, route measurements, fittings and installation constraints.

Manual J + S → Manual DRoom CFM and the selected blower transfer here automatically. ComfortIQ Design calculates friction rate and duct sizes after pressure losses are verified.
Use the same project sketch areaUpload the duct route with measured trunks, branches, fittings, registers, returns and equipment location. Label it “Duct route” in the file notes.
ROOM-BY-ROOM AIRFLOW HANDOFF

Manual J rooms ready for Manual D

Final heating and cooling CFM populate after the Manual J calculation is reviewed.

UPGRADE OR PURCHASE

Add Manual S or Manual S & D

Your Manual J information stays with this project. Purchase or apply the correct credit to unlock only the additional intake you need.

CURRENT PURCHASEManual JManual J can be submitted from the Rooms step.
ADD EQUIPMENT SELECTION

Upgrade to Manual J + S

Uses the completed Manual J loads for certified equipment selection.

  • AHRI equipment match
  • Design-condition capacity
  • Blower airflow and zoning
Live billing connectionIn production, these forms unlock only after payment succeeds or an available combination credit is applied. This demo button safely tests the unlock and return flow without charging anything.View credits, packs and billing

STEP 7 OF 7

Review before sending

ComfortIQ Design checks the Manual J inputs, Manual S equipment information and Manual D route information together.

PROJECTNot enteredAddress needed
HOME—Whole-home defaults
LEVELS1Footprints captured
ROOMS1Room-by-room entries
MANUAL SEquipment pendingAHRI and design performance
MANUAL DRoute pendingStatic pressure and measured runs
GUIDED SELF-CHECK

Let ComfortIQ Design help you fix anything that needs attention

Each issue explains why it matters. “Show me” takes you to the exact answer to verify, but it never changes your information or asks you to guess.

    Before the calculation begins
    • ComfortIQ Design verifies every “Not sure” answer.
    • Room dimensions and exterior directions are checked for conflicts.
    • Manual J data is reused for Manual S and D rather than entered a second time.
    • The final J/S/D package will be generated only after the Cool Calc connection is configured and its results pass ComfortIQ Design review.
    REQUIRED CERTIFICATION

    Contractor attestation and electronic signature

    Review this statement carefully before signing.

    Your typed name, acceptance, date, and time are recorded together with this intake.